Rendering of the eight-lane immersed tube tunnel favoured by Metro Vancouver’s board of directors to replace the aging George Massey Tunnel. (Province of British Columbia image)

UPDATE: Work on Massey Tunnel replacement on hold after snap election called

The business case for the new crossing was expected to be completed this fall

Work on the business case for a new crossing to replace the aging George Massey Tunnel is officially on hold while British Columbians go to the polls.

On Monday, Premier John Horgan officially terminated his minority government agreement with the B.C. Green Party and called an election for Oct. 24, sending the public service into “caretaker mode” until the next government is sworn in.

READ MORE: Citing stability, B.C. Premier calls snap election for Oct. 24

A spokesperson for the Ministry of Transportation and Infrastructure confirmed Tuesday morning that work on the new crossing has stopped until after the election is over.

“Projects and activities will not be advanced, unless they have already been authorized by cabinet. Final decisions around Highway 99 expansion and the George Massey crossing have yet to be made, and so that work will pause during the interregnum,” the ministry said in an emailed statement.

Only a few days before the snap election was called, the ministry announced it was in the process of “identifying property necessary for future infrastructure improvements on Highway 99,” an initial step while work on the business case for the new crossing to replace the aging George Massey Tunnel is completed.

The ministry made the announcement on Friday, Sept. 18, adding a preferred replacement option had been determined.

“We continue to make progress toward selecting the right solution for a new crossing of the Fraser River on Highway 99 that aligns with regional plans,” Delta North MLA Ravi Kahlon said Friday on behalf of Minister of Transportation and Infrastructure Claire Trevena. “I know people want traffic congestion relief at the George Massey Tunnel without having to pay unfair tolls. Today’s announcement shows our government is taking action on much-needed improvements.”

Trevena announced on Sunday, Sept. 20 that she will not be seeking re-election, while Kahlon announced his intention to run again on Tuesday, Sept. 15.

READ MORE: B.C. transportation minister will not seek re-election

READ MORE: Kahlon seeking re-election in Delta North

The business case for the new crossing was expected to be completed some time this fall, though the election has likely changed that timeline.

The province is considering two options to replace the 61-year-old tunnel — and eight-lane immersed tube tunnel and an eight-lane bridge.

According to a technical analysis completed in December 2019, both options would have similar grades, include dedicated bus-only lanes and separated multi-use pathways for pedestrians and cyclists. Both options also come with comparable price tags — $4-5 billion for the tunnel and $3.5-4.5 billion for the bridge.

The immersed tube tunnel option, which was endorsed by Metro Vancouver’s board of directors in November 2019, would be about one kilometre longer and three metres deeper than the existing tunnel (to accommodate taller vehicles including double-decker buses), and located 42 metres upstream of the current structure to minimize property impacts, as well as reduce scouring at the existing GVRD water tunnel and avoid the location of a potential future BC Hydro transmission line, both of which are downstream.

The tunnel option would be a shorter crossing than the bridge and the project would also provide improved connectivity with Deas Island Regional Park.

The project would have in-river impacts during construction, however the analysis notes there is the potential for in-river habitat enhancements as well.

It’s estimated the environmental review for the tunnel option would take three years and construction would take five years, plus an extra year to close the portals of the existing tunnel and recommission it for “utility only” use. However, the report also notes that work in the river is likely to be limited to a six- or seven-month window each year, meaning if construction falls behind then critical path items could be delayed by six months or potentially even a year.

(Story continues below video)

The bridge option would be located 25 metres upstream of the current tunnel, stand 650 metres above the Fraser River and 380 metres above Deas Slough. With its suspended main section, the bridge would not require any piers in the Fraser River but would require them in Deas Slough.

The bridge would have more land-side property impacts than the tunnel option, including in Deas Island Regional Park, including long-term noise, light, visual and shading effects.

The environmental review for the bridge option is estimated to be shorter than the tunnel option, only one to two years, with the same five-year time frame for construction and additional year to close the portals of the existing tunnel and recommission it for “utility only” use.

(Story continues below video)

READ MORE: Business case for Massey Tunnel replacement expected by fall: transportation ministry

In the meantime, work continues on a $40-million suite of safety improvements to the Massey Tunnel.

Projects include resurfacing and line painting on Highway 99 between Steveston Highway and the Highway 17 Interchange (completed in November 2019); improving drainage to reduce pooling water and ice on the road at tunnel entrances; converting tunnel and roadway lighting to the LED standard to increase visibility and better illuminate the tunnel, as well as save energy and reduce greenhouse gas emissions; and upgrading the fire alarm, fire door, ventilation and electrical systems to ensure reliability and ongoing safety within the tunnel. Additional washing of the interior tunnel is also ongoing.

These additional safety improvements are scheduled to be complete by spring 2021.

— with files from Ashley Wadhwani and Tom Fletcher



editor@northdeltareporter.com

Like us on Facebook and follow us on Twitter

Delta

Get local stories you won't find anywhere else right to your inbox.
Sign up here

 

Aerial view rendering of the eight-lane immersed tube tunnel favoured by Metro Vancouver’s board of directors to replace the aging George Massey Tunnel. (Province of British Columbia image)

Rendering of the south portal of the eight-lane immersed tube tunnel favoured by Metro Vancouver’s board of directors to replace the aging George Massey Tunnel. (Province of British Columbia image)

Rendering of the south portal of the eight-lane immersed tube tunnel favoured by Metro Vancouver’s board of directors to replace the aging George Massey Tunnel. (Province of British Columbia image)

Rendering of the inside the eight-lane immersed tube tunnel favoured by Metro Vancouver’s board of directors to replace the aging George Massey Tunnel. (Province of British Columbia image)

Rendering of the eight-lane bridge option for replacing the 61-year-old George Massey Tunnel. (Province of British Columbia image)

Rendering of the eight-lane bridge option for replacing the 61-year-old George Massey Tunnel. (Province of British Columbia image)

Rendering of the eight-lane bridge option for replacing the 61-year-old George Massey Tunnel, as seen from the bridge deck. (Province of British Columbia image)

Just Posted

A overview concept drawing of the Central District and its City Plaza, Gateway and Kennedy Heights neighbourhoods included in the Mayor’s Housing Task Force for Scott Road report. (City of Delta photo)
Walkable mixed-use neighbourhoods focus of task force’s vision for Scott Road

Report by Mayor’s Housing Task Force for Scott Road was presented to Delta council on Monday

The number of new COVID-19 cases has risen sharply in Vancouver and the Fraser North region over the last week.
Chart: Tyler Olsen
CHARTS: Weekly COVID-19 case double in Fraser North health area, up 50% in Vancouver

The number of new COVID-19 cases has risen sharply in Vancouver and the Fraser North region.

A total of 6,967 vote-by-mail packages were issued in Delta North during the 2020 provincial election, representing just over 18 per cent of the 37,998 registered voters in the riding. As of Thursday, Oct. 29, 3,825 certification envelopes have been received by officials in the riding ahead of the final count on Nov. 6. (Liam Harrap photo)
Over 3,800 mail-in, absentee ballots received in Delta North to date

6,967 vote-by-mail packages issued in the riding, representing over 18 per cent registered voters

tease photo
Food truck desserts from Prague ‘pop up’ at Surrey shopping mall

The Praguery offers a modern take on a traditional pastry

Kristjon Olson in a photo released by Surrey RCMP.
High-risk offender back in custody facing child-porn charges, Surrey Mounties say

News of Kristjon Otto Olson’s arrest is posted to Surrey RCMP’s website

Sooke’s Paul Larouche enjoys gold panning along the Sooke River, looking for small treasures. (Aaron Guillen/News Staff)
VIDEO: Island man finds niche audience by gold-panning on YouTube

Paul Larouche, 29, with over 215,000 subscribers, opens up about his journey

Among the pumpkin carvings created this year by Rick Chong of Abbotsford is this tribute to fallen officer Cont. Allan Young.
Abbotsford pumpkin carver’s creations include fallen police officer

Rick Chong carves and displays 30 pumpkins every year

An online fundraising campaign in support of the six-year-old boy, Edgar Colby, who was hit by a car on Range Road Oct. 25 has raised more than $62,000 in a day. (Submitted)
$62K raised in 1 day for boy in coma at BC Children’s after being hit by vehicle in Yukon

The boy’s aunt says the family is “very grateful” for the support they’ve received from the community

The Excelsior 4 are set to make their second court appearance in Abbotsford on Monday (Nov. 2). (Ben Lypka/Abbotsford News)
‘Excelsior 4’: Animal activists set to enter not guilty plea in Abbotsford hog farm case

Animal rights activists expected to plead not guilty to charges, protest for Vancouver scheduled

Dennis Cholowski shows off a Jordan 2 Retro Just Don Blue sneaker, the type of shoe only a true sneakerhead would appreciate. (Facebook photo)
VIDEO: Chilliwack Chiefs alum Dennis Cholowski shows off ‘sneakerhead’ collection

The Detroit Red Wing has been spending his NHL paycheques building up an impressive closet of shoes

Join Black Press Media and Do Some Good

Pay it Forward program supports local businesses in their community giving

Health care employees take extensive precautions when working with people infected or suspected of having COVID-19. THE CANADIAN PRESS/Chris Young
WorkSafeBC disallows majority of COVID-19 job injury claims

Health care, social services employees filing the most claims

Vancouver Symphony Orchestra Maestro Otto Tausk. (Photo: vancouversymphony.ca)
50/50 lotto players buck up for Metro Vancouver musicians hit hard by COVID

‘Rapidly growing jackpot’ for VSO’s 50/50 draw as they go online with TheConcertHall.ca

Abbotsford’s Kaitlyn Cassels is visited by her mother Heather Musika while recovering in hospital. (Submitted)
Abbotsford woman to have life-long injuries after falling 27 feet from bridge

19-year-old Kaitlyn Cassels says a misstep near the Agassiz-Rosedale Bridge led to a 27-foot fall

Most Read