The Pattullo Bridge (Black Press files)

Overnight closures on Pattullo Bridge as earthquake warning system installed

Northbound closures are planned from 10 p.m. to 5 a.m. on certain nights through to Nov. 4

A variety of overnight closures are planned for the Pattullo Bridge through to Nov. 4 as a “seismic activity and wind warning system” is installed.

The closures, which will only effect the northbound lanes, are to “support bridge safety” through the continued installation of the earthquake warning system.

The installation includes warning sensors, bridge closure devices, fibre-optic cables as well as advanced warning lights and signs.

TransLink says once complete, the system will be able to block entry to the bridge in the event of a seismic of high wind event. It will monitor wind speeds and detect earthquakes to “provide alerts up to one minute prior to damaging ground waves reaching the bridge,” according to a report considered at a Sept. 25 meeting of the Mayor’s Council on Regional Transportation.

In an emailed statement, TransLink told the Now-Leader that the system will involve the installation of ground sensors that detect seismic activity.

“Once the system is activated, gates, similar to railway gates, come down to prevent traffic from crossing the bridge. In addition to the gates, the system also consists of advance warning flashers and signage for vehicles, cyclists, and pedestrians,” the statement explained.

READ MORE: Earthquake warning system being installed for Pattullo Bridge

READ ALSO: New Pattullo Bridge expected to open in 2023, Feb. 16, 2018

The current crossing is more than 80 years old and was not designed to meet current wind and seismic loading standards that would apply to a new bridge constructed today, the report notes.

“As result, may be vulnerable in a seismic or hurricane-level wind event,” the Mayors Council report states. “To improve safety for Bridge users, an advance warning and monitoring system is being designed and implemented.”

It’s expected to be complete by the end of the year.

Bridge users are encouraged to use the Port Mann or Alex Fraser bridges as alternatives during the closures.

Emergency vehicles, cyclists and pedestrians will be able to cross the bridge in both directions at all times.

The closures will run from 10 p.m. to 5 a.m. nightly from now until Nov. 4 (excluding Oct. 18, 19, 25, 26, 31, and Nov. 1 and 2).

Meantime, the $1.3 billion replacement of the bridge linking Surrey and New Westminster is scheduled to start by the end of 2019 and be completed in 2023. Built north of the existing 80-year-old structure, the new bridge will still have four vehicle lanes, plus pedestrian and bike lanes and a new off-ramp to Highway 17, the South Fraser Perimeter Road.



amy.reid@surreynowleader.com

Like us on Facebook and follow Amy on Twitter

Just Posted

Fairs and markets aplenty in Delta this holiday season

Looking for artisan goods, baked treats and hand-crafted gifts? We’ve got you covered.

Over $857,000 in grants for 24 Delta sport, arts and culture organizations

Twenty-four groups are set to receive the funding via provincial community gaming grants

‘It felt good’: Milestone cross-country win for Fleetwood Park’s Jaiveer Tiwana

After winning the boys provincial championship, he’ll compete for a national title on Nov. 30

Filipino-Canadian artists featured in new ‘Green’ exhibit in Surrey

Opening reception Nov. 23 at Surrey Art Gallery

Surrey Save-On-Foods supports Cloverdale Community Kitchen’s Christmas Hamper program

Farquhar hopes locals will donate food, toys, gift cards, or warm clothing, such as mitt and toques

B.C. to restrict nicotine content, bring in 20% tax on vaping products

Province will also restrict candy and fruit flavoured vaping products to adult-only stores

Bus drivers to refuse overtime as talks break down between Unifor, Coast Mountain

Overtime ban could disrupt 10-15 per cent of bus service in Metro Vancouver

‘It’s been 12 years’: Father of murdered B.C. real estate agent pleads for mayor’s help

Lindsay Buziak was stabbed to death on Feb. 2, 2008 in Saanich. Her case is unsolved.

B.C. woman sends fight to reduce preventable medical errors to Victoria

Teri McGrath and South Okanagan senior’s centre members presented 150 signature petition to local MLA

B.C. First Nation Chief Ed John faces historic sex charges

John served as minister for children and families under then-premier Ujjah Dosanjh

Yelling at your dog might hurt its long-term mental health: study

Researchers find dogs trained using negative reinforcement are more ‘pessimistic’

Black Press career fair happening now at Langley Events Centre

Find your dream job at the Black Press career fair

What’s happening: week of Nov. 14

Events and community listings for North Delta

Most Read