Computer system cost control needed: auditor

Auditor General Carol Bellringer says big computer upgrades are a problem the world over, not just at ICBC and the B.C. health ministry

B.C. Auditor-General Carol Bellringer

B.C.’s auditor general is recommending a new oversight system for information technology project costs, as the province struggles to update old computer systems that control everything from vehicle insurance to health records.

The B.C. government spent $668 million on information technology in the last fiscal year, Auditor General Carol Bellringer said in a report released this week.

Bellringer reported in 2015 that a health ministry system to track infectious diseases ran more than four times over its original budget and was five years late. The province’s Integrated Case Management System for vulnerable children and adults was declared complete only after its function was downgraded.

And a student data system for school districts, implemented for $95 million to replace another system that had proven costly and unreliable, had its own glitches and slowdowns when it was put in place for the 2015 school year.

B.C. Finance Minister Mike de Jong says information systems are among the most difficult projects to manage for government, which often lacks the in-house expertise to supervise them. The government says it is moving ahead on Bellringer’s recommendation to set up central oversight of projects across the government, and mandate letters for all ministries next year will require significant IT projects to be reported to the responsible minister.

NDP critic Bruce Ralston said the government recently fired the main contractor for its “Clinical Systems Transformation Project” in the health ministry, an $842 million system with an uncertain future.

He said other IT projects that ran into trouble and over-budget include BC Hydro’s system upgrade and JUSTIN, a criminal case management database for police investigations, court documents and victims or witnesses of crime.

“The immense waste and mismanagement of the Christy Clark government comes down to wasted money on companies like IBM for faulty systems that should have gone to front-line services for kids in care, students and patients,” Ralston said.

Bellringer’s review found that problems with IT systems are found in all government and private sector organizations. World-wide, one out of five IT projects fails, and the majority have significant problems not anticipated at the outset.

 

Just Posted

RCMP investigate two shootings in Surrey

Incidents happened in Whalley, Newton

Reach leader honoured for lifetime of service in Delta

Rotary Club of Ladner awarded Renie D’Aquila with the prestigious Paul Harris Fellow Award

COLUMN: Fighting racism to build a safer, more inclusive B.C.

MLA Ravi Kahlon is travelling across B.C. to discuss emerging issues on racism and hate incidences

Surrey Board of Trade fears SkyTrain expansion will impede other transit needs

‘We need transit improvements in all of Surrey,’ Anita Huberman says

North Delta Secondary teacher up for B.C. education award

Prabhjot Grewal is up for a Premier’s Award for Excellence in Education in the Outstanding New Teacher category

Rich the Vegan scoots across Canada for the animals

Rich Adams is riding his push scooter across Canada to bring awareness to the dog meat trade in Asia

Canadian high school science courses behind on climate change, says UBC study

Researchers found performance on key areas varies by province and territory

UPDATE: One dead after house fire in rural Maple Ridge

Dewdney Trunk Road closed, traffic being re-routed

Six inducted into BC Hockey Hall of Fame

The 26th ceremony in Penticton welcomed powerful figures both from on and off the ice

Highway 1 closed near Revelstoke

No estimated time for opening

CRA program to help poor file taxes yields noticeable bump in people helped

Extra money allows volunteer-driven clinics to operate year-round

Recall: Certain Pacific oysters may pose threat of paralytic shellfish poisoning

Consumers urged to either return affected packages or throw them out

How a Kamloops-born man helped put us on the moon

Jim Chamberlin did troubleshooting for the Apollo program, which led to its success

Most Read